Projects

IQE Flue Stack

Newport

Location

Newport

Client

IQE

Main Contractor

CMB Engineering

Engineer

Bingham Hall Partnership

Architect

N/A

Tonnage

1.5t

Details

Due to the planned installation of a heavier, more durable stainless steel flue at the Semiconductor manufacturing facility IQE in Newport, we were required to swap the existing flue and stack out over a 2 day shut down period. In order to aid this tight time frame, the stack was pre built on site to allow the ducting contractor to install the flue ahead of time. All was installed with time to spare on the second day.