Home

We Have Built Our Reputation as a Reliable Supplier

Our vast range of services span many industry sectors, offering specialised products and services from first fix structural steelwork to stainless steel balustrading. We have built our reputation as a reliable supplier within our sector by building relationships derived from 3 key factors.

Safety

Safety is Never a Spectator Sport!

Attention to Detail

Great workmanship is in the small detail.

Transparency

We will work with you achieve your goals.

Recent Projects

Take a look at the recent and past projects we have undertaken to get a better understanding of the products and services we provide to many sectors. Each project different from one another in terms of services provided and scale.

KLA Roof Stack

Newport

Location

KLA Manufacturing Facility, Newport

Client

CMB Engineering

Main Contractor

CMB Engineering

Engineer

Bingham Hall Partnership

Architect

Avante Architects

Tonnage

6t

Details

As part of our structural package at the KLA manufacturing facility in Newport, we fabricated and installed a 9m high roof stack designed to support the exhaust flues pre installed by Parker Environmental when the stack was at ground level.

KLA Flue Stack

Newport

Location

KLA Manufacturing Facility, Newport

Client

CMB Engineering

Main Contractor

CMB Engineering

Engineer

Bingham Hall Partnership

Architect

Avante Architects

Tonnage

10t

Details

We completed the installation of the flue stack in mid 2024 following the installation of the adjacent gas bunker in the previous December. The flue stack stands completely independent of the gas bunker to a total of 22m high. The…

TATA Maintenance Frame

Port Talbot

Location

TATA Steelworks, Port Talbot

Client

Rubix

Main Contractor

N/A

Engineer

N/A

Architect

N/A

Tonnage

20t

Details

We fully designed, fabricated and installed a production equipment maintenance platform. The platform will be used to undertake critical maintenance on the production parts used to roll the steel slabs produced by the mill. Each 30t plus part will be…

Cardiff Golf Club Balcony

Cardiff

Location

Cardiff, Cyncoed

Client

Cardiff Golf Club

Main Contractor

SSS Engineering Services Ltd

Engineer

Grays

Tonnage

20t

Details

We were contracted by Cardiff Golf Club to assist in the demolition of their existing timber balcony, followed by the installation of the of the new and improved steel balcony complete with stainless steel and glass balustrading. Our client had…

AHU Supporting Platform

Heath Hospital

Location

Cardiff, Heath

Client

University Hospital of Wales

Main Contractor

BECT Building Contractors

Engineer

Cambria

Architect

N/A

Tonnage

7t

Details

Due to the full time operations of the Hospital, our installation needed to take place out of hours over the duration of two weekends. The steelwork was galvanized and shipped to BECT for intumescent coating prior to arriving on site…

IQE Flue Stack

Newport

Location

Newport

Client

IQE

Main Contractor

CMB Engineering

Engineer

Bingham Hall Partnership

Architect

N/A

Tonnage

1.5t

Details

Due to the planned installation of a heavier, more durable stainless steel flue at the Semiconductor manufacturing facility IQE in Newport, we were required to swap the existing flue and stack out over a 2 day shut down period. In…

St Mellons Golf Club Driving Range

Cardiff

Location

Cardiff

Client

St Mellons Golf Club

Main Contractor

N/A

Engineer

N/A

Architect

LEB Architectural Design

Tonnage

3t

Details

We recently had the pleasure of designing, manufacturing & installing a new and improved driving range shelter for St Mellons Golf Club. The range will help the clubs junior academy which is growing rapidly.

Walk on Ceiling Supporting Steelwork

Cambridge

Location

Huntington

Client

Paragraf

Main Contractor

CMB Engineering

Engineer

Rhodes & Partners

Architect

Avante Architects

Tonnage

21t

Details

We were contracted to install 21t of structural steelwork in order to support the elevated walk on ceiling installed by Norwood. The columns of the goal post structure were made from 203x203x46 UC with the main horizontal beams being made…

Mezzanine Floor

Cambridge

Location

Huntington

Client

Paragraf

Main Contractor

CMB Engineering

Engineer

Bingham Hall Partnership

Architect

Avante Architects

Tonnage

24t

Details

We were contracted to erect 24t of structural steelwork and 370m2 of MF60 decking to this internal plant room floor. The erection was conducted using a 405c spider crane due to height restrictions.

Gas Bunker

Newport

Location

KLA Development

Client

KLA

Main Contractor

CMB Engineering

Engineer

Bingham Hall Partnership

Architect

Avante Architects

Tonnage

25t

Details

We supplied and installed 25t of galvanized structural steelwork for a chemical gas bunker at the Newport KLA development. The bunker has since been completed with RC walls and a roof structure which will interface with 360m2 of CF51+ comflor…