Projects

TATA Maintenance Frame

Port Talbot

Location

TATA Steelworks, Port Talbot

Client

Rubix

Main Contractor

N/A

Engineer

N/A

Architect

N/A

Tonnage

20t

Details

We fully designed, fabricated and installed a production equipment maintenance platform.

The platform will be used to undertake critical maintenance on the production parts used to roll the steel slabs produced by the mill.

Each 30t plus part will be lowered into the frame by the overhead gantry crane into the platforms guides.