Projects
Walk on Ceiling Supporting Steelwork
Cambridge
Location
Huntington
Client
Paragraf
Main Contractor
CMB Engineering
Engineer
Rhodes & Partners
Architect
Avante Architects
Tonnage
21t
Details
We were contracted to install 21t of structural steelwork in order to support the elevated walk on ceiling installed by Norwood. The columns of the goal post structure were made from 203x203x46 UC with the main horizontal beams being made from 254x254x73 UC. This provided adequate support for the wall bearing 180x90x26 PFCs which would be used to carry the walk on ceiling panels.