Walk on Ceiling Supporting Steelwork

Cambridge

Location

Huntington

Client

Paragraf

Main Contractor

CMB Engineering

Engineer

Rhodes & Partners

Architect

Avante Architects

Tonnage

21t

Details

We were contracted to install 21t of structural steelwork in order to support the elevated walk on ceiling installed by Norwood. The columns of the goal post structure were made from 203x203x46 UC with the main horizontal beams being made from 254x254x73 UC. This provided adequate support for the wall bearing 180x90x26 PFCs which would be used to carry the walk on ceiling panels.